Our success is based on our COMMITMENTto our customers
MILPO ANDINA PERU
Milpo Andina Peru asked GEMIN ASSOCIATES to provide basic and detailed engineering for the “Winze 1” shaft for the El Porvenir Mine, increasing operations from levels -1,150 to -1,650. Engineering activities consisted of excavation, support, ventilation, geomechanical studies and induced seismic studies.