GEMIN ASSOCIATES, has a successful track record in delivering the best results for our clients and look forward to working with new clients in reaching their GOALS!!!.
Assembly and installation of 3 construction hoists, galloway and the control system for the El Porvenir Mine.
Study and design recommendations for the Skouries Mine from levels 110 to 596 in order to determine the maximum haulage rate.
HOCHSCHILD has contracted GEMIN to perform a cross check of the milling plant and other equipment in the process plant (Au – Ag) of the Inmaculada Mining Unit located at 4819 masl.
Pumping system for the “Manuelita" shaft owned by Compañía Minera Argentum.
Engineering study for the electrical system upgrade, with the infrastructure entering via the “Winze 1” shaft.
Sinking setup for the deepening of the “Winze 1” shaft for the El Porvenir Mine.
Mineral transport system for Cori Puno Mine owned by Horizonte Mining Company.
Civil infrastructure for the new “Winze 1” shaft.